ADVANCED ESTIMATING

Concreting Quote Template

A free quote template for a residential concrete slab, set out the way subbies actually quote — work grouped under clear headings (excavation, formwork, reo, concrete) with a single lump sum for each. Edit any heading or inclusion to suit your job, enter your price per section, then print or save it as a PDF. No quantities or rates on show, no sign-up, nothing saved to our end.

Excavation & Site Preparation

$

Includes:

  • Set out (string line, pegs)
  • Excavate and level (100 mm dig)
  • Remove topsoil and dispose
  • Crushed-rock base and compaction (75 mm)
  • Termite barrier
  • Coordinate in-slab plumbing and electrical rough-ins

Formwork

$

Includes:

  • Timber edge boards (90 x 35 H3)
  • Stakes and framing nails
  • Penetration boxing (waste pipes, downpipes)
  • Form-release oil
  • Vapour barrier (0.2 mm polythene)

Reinforcement (Reo)

$

Includes:

  • SL82 reinforcing mesh
  • Trench mesh to footings
  • Bar chairs and spacers
  • Tie wire
  • Starter bars to walls (N12)

Concrete Supply & Placement

$

Includes:

  • Engineer pre-pour inspection
  • Concrete pump hire
  • Concrete supply (32 MPa, 20 mm aggregate)
  • Place, screed, float and edge
  • Power-trowel finish
  • Saw-cut control joints
  • Curing compound / sprayed seal
  • Concrete test cylinders

Clean-up

$

Includes:

  • Skip bin / waste removal
  • Site clean-down
Subtotal (ex GST)$0.00
GST 10%$0.00
Total (inc GST)$0.00

Notes / exclusions

How to structure a concreting quote

Most subcontractors quote a slab as a lump sum for each part of the job rather than exposing their quantities and rates. Grouping the work under clear headings — excavation, formwork, reinforcement and the concrete itself — shows the client exactly what they are paying for while keeping your pricing your own.

Excavation and preparation

Set-out, excavation, topsoil removal, the crushed-rock base and compaction, and the termite barrier. On a sloping or reactive site this part of the quote can carry more cost than the concrete.

Formwork

Edge boards, stakes, penetration boxing, form-release oil and the vapour barrier under the slab.

Reinforcement (reo)

Mesh, trench mesh, bar chairs, tie wire and starter bars, with the pre-pour inspection booked before any concrete is ordered.

Concrete supply and placement

Pump hire, concrete supply at the specified strength, placing and finishing labour, control joints, curing, test cylinders and the site clean-down.

Show your exclusions

A clear list of what is not included — rock, retaining, engineering design, out-of-hours work — is as important as the inclusions, and prevents disputes over variations later.

General guide only. Scope, headings and inclusions vary by project, plans, specifications and site conditions, and this template is not exhaustive. It does not constitute professional, financial or legal advice or a guarantee of final cost, and is not a substitute for a detailed estimate prepared from your plans. Obtain independent professional advice before making decisions about your project.